How Novatron’s Xsite DRILL Piling Solution Revolutionizes Solar Farm and Data Center Construction

Novatron’s Xsite® DRILL Piling, the latest version of Xsite® DRILL navigation system, is designed to enable rapid piling work –faster, more accurate, and easier way to way to carry out construction projects such as solar farms and data centers. Novatron’s Xsite DRILL Piling solution is compatible with various piling machines, easy to install and use. It guides the piling machine to the correct position and orientation with centimeter-level accuracy, making the repetitive process easy for the operator. 

This innovative piling solution is generally suitable for driven piling, screw piling, and bored pile construction. 

When building solar farms and data centers, the challenge is the same: thousands of foundations must be installed efficiently and with absolute accuracy.

So far, there’s been no specific solution for this, but Novatron’s innovative piling machine control system is about to revolutionize the industry on a large-scale.  

Novatron’s Xsite system and cloud service offer a complete solution for work and reporting 

Novatron’s solution includes a piling navigation system and cloud service. The digital pile plan is transferred directly to the machine’s Xsite® DRILL Piling machine navigation system through Novatron’s Xsite® MANAGE cloud service. When the piling is done, the operator can send the as-built data back to the office for quality control and reporting through a two-way wireless connection. 

A proven solution for large-scale piling projects

“Feedback for the system has been very positive. We are getting extra credit for the tech support that we are giving for the customers, but also the full ecosystem, that includes the Xsite DRILL but also the Xsite MANAGE Cloud service”, tells Joonas Sokka, Product Manager for Xsite DRILL Piling at Novatron. 

“Early use cases show that customers are able to drive 22,000 piles with 20–30% greater pile-driving efficiency and reduce the number of hours spent on surveying-related work by about 95%, which has a significant impact on construction schedule and speed of completion,” Sokka says. 

On large data center sites, piling is driven by weekly production targets and area handovers. Machine control helps keep production moving without waiting for repeated surveying and stakeout. When designs change, updated pile plans can be transferred digitally to the machine without repeating the traditional stakeout process.

The system is developed together with drill operators in Nordics and manufactured in-house by Novatron in Finland. In Sweden, the system is already in use and helping to power up the solar farm construction industry. Local installation, field service and user support is provided by official Xsite Dealers.

Novatron’s Xsite® DRILL Piling is available in selected markets. Check the availability from your local Xsite Dealer.

The Xsite DRILL Piling benefits include: 

  • Handling of models with a very large number of piles—even tens of thousands 
  • The entire workflow: design → machine → automatic as-built → management/reporting 
  • Compatibility with different machines and machine brands (brand-independent and installation flexibility) 

The Xsite DRILL Piling Features and Services include: 

  • Wireless display and Large 10″ touchscreen with clear graphics 
  • Accurate GNSS satellite positioning 
  • Pile plan wizard 
  • Auto-stop to target depth 
  • Wireless data transfer 
  • Support for IREDES, LandXML and .dxf file formats 
  • Automatic as-built documentation 
  • Tech support with remote access 

Learn more about Xsite DRILL: https://novatron.com/xsite-mc-products/machine-control-for-drills/ 

Find your local Xsite Dealer: https://novatron.com/resellers/ 

Interested in becoming a dealer? Learn more: https://novatron.com/resellers/interested-in-becoming-a-reseller/ 

About Novatron 
Novatron Oy is a Finnish technology company that develops and manufactures advanced Xsite® machine control systems, sensor technology, OEM components, and software that enable the construction of efficient, safe, and sustainable infrastructure. Novatron has offices in Finland and Sweden and operates internationally through a network of distributors and partners. Learn more: https://novatron.com